D’Ambra Construction | California
D'Ambra Construction needed a site office on the job within three weeks.
The office had to have heat and cooling, a power connection, and a lockable door. The company can move it to the next job.

The request
The office had to:
• Be completed within three weeks
• Provide secure daily access
• Include natural light and climate control
• Connect quickly to job-site power
• Withstand regular construction-site use
• Function as a reusable company asset
The office had to arrive ready for work.

The build
Conexwest converted one 40-foot high-cube one-trip container into the office.
The finished build included:
• Access: 3ft locking personnel door
• Windows: Dual-pane sliding windows
• Electrical: Full electrical package
• Power: 60-amp shore-power connection
• HVAC: 12,000 BTU A/C with heat
• Insulation: R-13 insulation
• Interior walls: FRP interior walls
• Flooring: Luxury vinyl plank flooring
• Exterior: Custom exterior paint

Result
The office was delivered on budget and inside the three-week window.

Other uses
The same layout can also be used for:
This format can work for:
• Construction site offices
• Project management spaces
• Supervisor stations
• Break rooms
• Safety offices
• Industrial field offices

Design the container in ConexBuilder
Design the container in ConexBuilder before you order.

